Communication & Electrical System Surveys

Hulkro supported the Thales Communication System and Electrical Design and installation Surveys at a number of sites including:

  • Bristol Temple meads Station

  • Upminster Control Centre

  • Highgate and Neasden Control Centres

The surveys included for:

  • As built surveys of the existing systems

  • Capturing site constraints and risks

  • Capturing site information required to specify the design and installation of the new systems

  • Capturing site information to prove, specify and design the cable route arrangements

  • Capturing site information to plan the system implementation works